logo
Home > products > Embedded Parts >
Stainless Steel Embedded Parts Prefabricated Building Architectural Hardware

Stainless Steel Embedded Parts Prefabricated Building Architectural Hardware

embedded parts prefabricated

stainless steel embedded parts

prefabricated embedment plate

Place of Origin:

Langfang, Hebei, China

Certification:

ISO9001

CONTACT US
Request A Quote
Product Details
Type:
Embedment
Shape:
Customized
Function:
Support And Fixation
Material:
Metal
Connection Method:
Welding
Application:
Building Construction
Thickness:
4mm 6mm
Size:
Customized
Highlight:

embedded parts prefabricated

,

stainless steel embedded parts

,

prefabricated embedment plate

Payment & Shipping Terms
Minimum Order Quantity
1000 pieces
Price
CN¥42.86-58.58
Packaging Details
Wooden frame or cardboard box packaging, customizable
Delivery Time
Delivery within 15-30 days
Payment Terms
T/T, PayPal, Xtransfer
Supply Ability
50000 pieces per day
Product Description

Stainless Steel Prefabricated Building Architectural Hardware Embedded Parts


 

Product Description

 

Embedded Parts are components that are pre installed (buried) in concealed engineering, and are components that are placed during structural pouring. They are used for overlapping during the construction of the upper structure to facilitate the installation and fixation of external engineering equipment foundations. Components consisting of steel plates and anchoring bars are left in the structure for the purpose of connecting structural or non structural components for fixation. For example, connectors used for fixing post production processes such as doors, windows, curtain walls, water pipes, gas pipes, etc. There are many connections between concrete structures and steel structures.

 

Features

 

1. By tightly bonding with concrete, it provides stable support or connection points for subsequent installation of equipment, pipelines, or other structures, enhancing the overall load-bearing capacity and stability of the structure.

 

2. Placing the embedded parts in place before pouring concrete can avoid tedious processes such as drilling holes and boreholes in the later stage, greatly improving construction speed and efficiency.

 

3. As it is pre embedded during the template construction phase, its final position can be determined very accurately, ensuring good integration with other structural elements.

 

4. There are various types, including but not limited to bolts, steel plates, steel bars, etc., and suitable forms and specifications can be selected according to specific engineering needs, suitable for various complex building design requirements.

 

Technical Parameters

 

Service
Custom OEM ODM
Thickness
0.2mm ~12mm
Process
Welding
Product name
Sheet Metal Fabrication Stamping Bending Welding Turnning Parts
Color
Customized Color
Application
Construction factory
Surface treatment
PaintingPowder CoatingPlatingPolishing
Material
Steel
Size
Customer's Requst
Packing
seaworthy packing+ customer requirements

 

 

 

Stainless Steel Embedded Parts Prefabricated Building Architectural Hardware 0

Stainless Steel Embedded Parts Prefabricated Building Architectural Hardware 1

 

 

Stainless Steel Embedded Parts Prefabricated Building Architectural Hardware 2

 

 

 

FAQ

 

Q1: Are you trading company or manufacturer ?

A1: We are factory.

 

Q2: How long is your delivery time?
A2: Generally it is 5-10 days if the goods are in stock. or it is 7-25 days if the goods are not in stock, it is according to quantity.
 
Q3: Do you provide samples ? is it free or extra ?
A3: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 
Q4: What is your terms of payment ?
A4: Payment≤1000USD, 100% in advance. Payment≥1000USD, 30% T/T in advance ,balance before shippment.

 

Send your inquiry directly to us

Privacy Policy China Good Quality Galvanized Cable Tray Supplier. Copyright © 2025 Tianjin Baoli Gold Pipe Co., Ltd . All Rights Reserved.